The build sequence

What we build

Enabling works01 / 40

Survey and setting out

Enabling works02 / 40

Site establishment — hoarding, offices, power and water

Enabling works03 / 40

Clearance and demolition

Enabling works04 / 40

Temporary access and material laydown

Enabling works05 / 40

Bulk excavation

Substructure06 / 40

Shoring to the excavation faces

Substructure07 / 40

Dewatering

Substructure08 / 40

Bored piling

Substructure09 / 40

Pile integrity testing

Substructure10 / 40

Breaking down pile heads

Substructure11 / 40

Blinding concrete

Substructure12 / 40

Tanking and waterproofing

Substructure13 / 40

Raft reinforcement and pour

Superstructure14 / 40

Retaining walls and basement

Superstructure15 / 40

Backfill and compaction

Superstructure16 / 40

Shear core and lift shaft

Superstructure17 / 40

Columns

Superstructure18 / 40

Formwork, reinforcement and slab pour

Superstructure19 / 40

Striking formwork — the floor cycle repeats

Superstructure20 / 40

Stairs, roof slab and parapet

Envelope21 / 40

Blockwork and partitions

Envelope22 / 40

Cladding substructure

Envelope23 / 40

Stone and aluminium cladding

Envelope24 / 40

Curtain wall and glazing

Envelope25 / 40

Roof insulation and waterproofing

Electromechanical26 / 40

Sleeves and embedded conduit

Electromechanical27 / 40

Cable containment, trays and risers

Electromechanical28 / 40

Plumbing and drainage rough-in

Electromechanical29 / 40

HVAC ducting and chilled water

Electromechanical30 / 40

Fire fighting network and pumps

Electromechanical31 / 40

Low current — data, CCTV, fire alarm

Electromechanical32 / 40

Main switchgear, distribution boards and MCCs

Finishes and handover33 / 40

Internal plaster

Finishes and handover34 / 40

Screed and floor levelling

Finishes and handover35 / 40

Wet area waterproofing and tiling

Finishes and handover36 / 40

Gypsum ceilings and bulkheads

Finishes and handover37 / 40

Painting and decoration

Finishes and handover38 / 40

Joinery — doors, wardrobes, kitchens

Finishes and handover39 / 40

Marble, sanitary ware and fittings

Finishes and handover40 / 40

Lifts, testing, commissioning and handover

01 of 40
62

reference projects in electrical and low-current systems

21

buildings in Makkah — towers, hotels and a mosque

12

international brands we build and service with

What we build

All construction works

Projects

Makkah Al-Mukarramah

Electromechanical systems

Systems running on 62 sites across the Kingdom

From King Abdulaziz International Airport in Jeddah and the Aramco Yanbu refinery to hotels, malls, pump stations and treatment plants. Panels, motor control centres, SCADA, suppression and pumps.

Switchgear & distributionMotor control centresSCADAFire alarm & suppressionWater pumps

From the reference list

  • King Abdulaziz Airport — JeddahValves & pumps
  • Aramco Yanbu RefineryDDC panels
  • Princess Noura University — RiyadhDDC panels
  • King Road Tower — JeddahFM-200
  • Makkah Mall — MakkahLPG system
See the full list →

We build and service with

Schneider ElectricSiemensHoneywellGrundfosTycoAnsulCla-ValReliableCooper SafetyRegoInfosecTecno Control
Finishing & interiors

The highest standard of finish

Facades, cladding, ceilings and interior finishing — including the doors, wardrobes and kitchens we manufacture from kiln-dried timber.

See the finishing work →
Entrance lobby — marble floor and central chandelier
Timber doors
Kitchens and wardrobes

Got drawings or a bill of quantities?