All construction works

Structure, electromechanical systems and finishing — and the order a job runs in.

The build sequence

Scroll down

Six phases — structure, systems and finish.

Enabling works01 / 40

Survey and setting out

Enabling works02 / 40

Site establishment — hoarding, offices, power and water

Enabling works03 / 40

Clearance and demolition

Enabling works04 / 40

Temporary access and material laydown

Enabling works05 / 40

Bulk excavation

Substructure06 / 40

Shoring to the excavation faces

Substructure07 / 40

Dewatering

Substructure08 / 40

Bored piling

Substructure09 / 40

Pile integrity testing

Substructure10 / 40

Breaking down pile heads

Substructure11 / 40

Blinding concrete

Substructure12 / 40

Tanking and waterproofing

Substructure13 / 40

Raft reinforcement and pour

Superstructure14 / 40

Retaining walls and basement

Superstructure15 / 40

Backfill and compaction

Superstructure16 / 40

Shear core and lift shaft

Superstructure17 / 40

Columns

Superstructure18 / 40

Formwork, reinforcement and slab pour

Superstructure19 / 40

Striking formwork — the floor cycle repeats

Superstructure20 / 40

Stairs, roof slab and parapet

Envelope21 / 40

Blockwork and partitions

Envelope22 / 40

Cladding substructure

Envelope23 / 40

Stone and aluminium cladding

Envelope24 / 40

Curtain wall and glazing

Envelope25 / 40

Roof insulation and waterproofing

Electromechanical26 / 40

Sleeves and embedded conduit

Electromechanical27 / 40

Cable containment, trays and risers

Electromechanical28 / 40

Plumbing and drainage rough-in

Electromechanical29 / 40

HVAC ducting and chilled water

Electromechanical30 / 40

Fire fighting network and pumps

Electromechanical31 / 40

Low current — data, CCTV, fire alarm

Electromechanical32 / 40

Main switchgear, distribution boards and MCCs

Finishes and handover33 / 40

Internal plaster

Finishes and handover34 / 40

Screed and floor levelling

Finishes and handover35 / 40

Wet area waterproofing and tiling

Finishes and handover36 / 40

Gypsum ceilings and bulkheads

Finishes and handover37 / 40

Painting and decoration

Finishes and handover38 / 40

Joinery — doors, wardrobes, kitchens

Finishes and handover39 / 40

Marble, sanitary ware and fittings

Finishes and handover40 / 40

Lifts, testing, commissioning and handover

01 · What we build

Structure & infrastructure

Excavation, foundations and footings, reinforced concrete, structural frames, precast elements, culverts, drainage and road works.

  • Piling and drilling rig
    Piling and drilling rig
  • Excavation and earthworks
    Excavation and earthworks
  • Trenching and drainage
    Trenching and drainage
  • Reinforcement and footings
    Reinforcement and footings
  • Buried pipework
    Buried pipework
  • Precast panels, set by crane
    Precast panels, set by crane
  • A precast boundary wall going up
    A precast boundary wall going up
  • Steel sections arriving on site
    Steel sections arriving on site
  • Steel sections for shoring the excavation
    Steel sections for shoring the excavation
  • A pile rig inside the shored excavation
    A pile rig inside the shored excavation
  • The concrete pump over the foundation pit
    The concrete pump over the foundation pit
  • Reinforcement — the raft steel mat and column starter bars
    Reinforcement — the raft steel mat and column starter bars
  • Pouring the raft over the reinforcement
    Pouring the raft over the reinforcement
02 · What we build

Electromechanical systems

Main switchgear and distribution boards, motor control centres, SCADA, fire alarm and suppression, pumps and pressure sets.

  • Main switchgear and distribution boards
    Main switchgear and distribution boards
  • Motor control gear, wired and terminated
    Motor control gear, wired and terminated
  • Low current: CCTV, access, alarm and data
    Low current: CCTV, access, alarm and data
03 · What we build

Finishing & interiors

Facades and cladding, interior finishing, ceilings, and the doors, wardrobes and kitchens we make from kiln-dried timber.

  • Entrance lobby — marble floor and central chandelier
    Entrance lobby — marble floor and central chandelier
  • Timber doors
    Timber doors
  • Kitchens and wardrobes
    Kitchens and wardrobes
  • Wall panelling
    Wall panelling
  • Majlis and finishing
    Majlis and finishing
In detail

Every system, as the profile specifies it

The electromechanical and low-current division supplies, installs and commissions the following.

01

Network engineering solutions

One 10/100/1000 TCP/IP backbone carrying building management, security and life safety, with a redundant central database and a disaster-recovery location.

  • Web-enabled BMS workstations and web-enabled NAE controllers
  • Central security redundant database server
  • Smart card server and smart cards
  • Disaster recovery location
  • Building security system and CCTV
  • Access control and intercom systems
  • Fire alarm on the same backbone
  • Lifts and elevators system integration
  • Generator, UPS and power metering
  • E-banking terminals
02

Main switchgear and distribution panel boards

Type-tested, factory-built assemblies on Merlin Gerin PRISMA P, PE, G, GE and GR functional systems, built to the customer’s specification under technical supervision.

  • Solid copper busbars, type tested under full short-circuit conditions, with their supports and mountings
  • Circuit breakers whose breaking capacity greatly exceeds the prospective short-circuit currents anywhere in the Kingdom
  • Fully adjustable thermal and magnetic trip mechanisms protecting the low-voltage network
  • Motor-operated breakers, withdrawable or fixed pattern, with the interlocks and auxiliaries for automatic power transfer
  • Busbars and breakers rated for continuous duty at 50 °C, for trouble-free operation in extreme climate
  • Expandable on Masterblock construction with Masterpact ACBs up to 6000 A

Built on

Merlin GerinPRISMAMasterpact
03

Motor control centres

Designed, assembled and type tested to international and local standards, with incoming connections factory fitted.

  • Fully withdrawable type 3, or fixed type 1 and 2 construction
  • Built to SASO, IEC and BS
  • Automatic systems covering power distribution, the machine or installation, and the control equipment
  • Control components performing detection, data processing and logic switching, dialogue, and conditioning
  • Applied across heating, ventilation and air conditioning installations

Built on

SASOIECBS
04

SCADA

Supervisory control for industrial and water-treatment sectors, delivered as a full control solution rather than a supply.

  • Full control-system solutions with RTUs
  • Radio and fibre telemetry, cable and telemetry treatment

Built on

SiemensSchneider Electric
05

UPS systems

  • A range covering every sector, supplied with all required accessories
06

Fire alarm

  • Conventional and addressable systems, supplied and installed
07

Fire protection valves, sprinklers and pumps

UL listed and FM approved throughout, from four manufacturers.

  • Muller — outside screw and yoke gate valves, non-rising stem gate valves, butterfly valves, ball valves, wafer and swing check valves, indicator posts, strainers
  • TYCO and Reliable — UL/FM automatic sprinklers, valves and accessories
  • Cla-Val — pressure reducing valves and pressure relief valves
  • Grundfos / Peerless — electric driven, diesel driven and jockey fire pumps with Firetrol controllers

Built on

MullerTYCOReliableCla-ValGrundfosPeerlessFiretrol
08

Water pumps

The complete range, from engineering consultation through installation, testing and commissioning.

  • Booster pumps
  • Waste water pumps
  • Chilled water pumps
  • Circulating pumps
Electromechanical systems

Systems running on 62 sites across the Kingdom

From King Abdulaziz International Airport in Jeddah and the Aramco Yanbu refinery to hotels, malls, pump stations and treatment plants. Panels, motor control centres, SCADA, suppression and pumps.

#TypeLocationScope
01Le-Meridian HotelMadinahFM-200 Fire Suppression
02Stars AvenueJeddahLPG System
03Princess Noura UniversityRiyadhDDC Panels
04Wadi Aldwaser Technical College—DDC Panels
05Haifa MallJeddahLPG System
06King Road TowerJeddahFM-200 & CO2 Suppression
07Sport CityJeddahDDC & MCC Panels
08Ministry of Water & ElectricityYanbuSurge Relief Valves
09Makkah MallMakkahLPG System
10Dammam Substation—FM-200 Fire Suppression
11Arar Pump Station—MCC Panels
12Tabuk STP—MCC Panels & SCADA
13Butcher RestaurantJeddahWet Chemical Suppression
14Jizan STP—MCC Panels
15King Abdul Aziz AirportJeddahPressure Reducing Valves
16King Abdul Aziz AirportJeddahWater Cooling Pumps
17Garden MallHailLPG System
18Nadec Dairy 4, 5 & 6—R.O. Systems 500 m3/day each
19Nadec Dairy 3—R.O. System 1500 m3/day
20Al-Tayseer TowersMakkahMATV System
21Samah CenterHailLPG System
22Eamar ALtheia—R.O. System 3000 m3/day
23Air Defense Jeddah CollegeJeddahSCADA System
24Valley MallArarLPG System
25Kosebasi RestaurantJeddahLPG & Wet Chemical
26Abu Tabanja TowerMakkahMATV System
27Wagamama RestaurantJeddahLPG System
28Sultan Ahmat RestaurantJeddahLPG System
29Jan Burger RestaurantsJeddahLPG System
30Lulu Hypermarket - Jamea SquareJeddahLPG System
31Dhahran Mall—LPG System
32Movenpick HotelJeddahLPG System
33OKAM WarehouseJeddahFire Fighting Pumps
34AIC FactoryJeddahLPG System
35Chopsticks RestaurantJeddahLPG System
36Lulu Hypermarket - MarwahJeddahLPG System
37Al-Hidayah TowersMakkahMATV System
38King Faisal University—DDC Panels
39National Drink Factory—DDC Panels
40Bisha R.O. Plant—SCADA System
41Lulu Hypermarket - HamdaniyaJeddahLPG System
42Chemical TreatmentManfohaSCADA System
43Al-Kharj STP Plant—MCC Panels
44AlHassa Plastic Factory—MCC & MDP Panels
45Imam University—DDC & MCC Panels
46Aramco Yanbu RefineryYanbuDDC Panels
47Bader STP Plant—MCC Panels
48Sharourah Pump Station—MCC Panels
49Qunfuda Pump Station—MCC Panels
50Lulu Hypermarket - Madina RoadJeddahLPG System
51Al-Dawadmi Technical College—DDC Panels
52Muzahmiah University—DDC Panels
53Batha STP Plant—MCC Panels
54Qaseem University—DDC Panels
55Azieziah Pump Station—MCC Panels
56Lulu Hypermarket - BaladJeddahLPG System
57Taj PalaceJeddahLPG System
58Yamamah PalaceRiyadhDDC Panels
59Manahi RestaurantMakkahLPG System
60Al-Sharqawi Villa—LPG & Wet Chemical
61NKB BankJeddahFM-200 Fire Suppression
62Al-Murjan Office—NOVEC Fire Suppression
We build and service with
Schneider ElectricSiemensHoneywellGrundfosTycoAnsulCla-ValReliableCooper SafetyRegoInfosecTecno Control